This is the shooting schedule that I planned on the weekend of shooting. I aimed to get a majority shot by the end of Saturday and then the rest shot on Sunday. However this didn't work out successfully. We spent all day Saturday recording and ran over by an hour, still not completing everything noted down for Saturday. Therefore Sunday was all the rest of the un shot scenes as well as the scenes still needed to be shot. Sunday ran over by around an hour and a half. We started just before 12pm and finished at around 5.30pm. The rain during the Sunday didn't help either as we found it very difficult to film in this condition as everything had to be carefully handled as notto get wet and the group was very cold during it. Luckily James still did an incredible job of acting in front of the camera through these conditions and looking back on the rushes this was a successful shoot.